Resource Type

Journal Article 442

Conference Videos 5

Year

2024 1

2023 30

2022 34

2021 32

2020 32

2019 21

2018 27

2017 26

2016 28

2015 11

2014 20

2013 16

2012 16

2011 32

2010 16

2009 18

2008 18

2007 21

2006 7

2005 8

open ︾

Keywords

response surface methodology 9

Response surface methodology 7

surface 7

dam 6

arch dam 5

surface roughness 5

surface water 5

surface integrity 4

adsorption 3

earthquake 3

Algae 2

Biofilm 2

Colloids 2

Cr(VI) 2

Dam 2

Dam safety 2

Membrane fouling 2

Nanoparticle 2

TGP 2

open ︾

Search scope:

排序: Display mode:

Key Technologies of the Hydraulic Structures of the Three Gorges Project

Xinqiang Niu

Engineering 2016, Volume 2, Issue 3,   Pages 340-349 doi: 10.1016/J.ENG.2016.03.006

Abstract: Many key technological problems regarding hydraulic structures have been overcome, such as a gravity dam

Keywords: Three Gorges Project     Large orifice gravity dam     Penstock on dam downstream surface     Tailrace tunnel with    

application of the real-time monitoring system for filling construction process of high core rock-fill dam

Cui Bo,Hu Lianxing,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 91-96

Abstract:

In this paper, on the basis of research on high core rock-fill dam fillingmonitoring is determined; the solution scheme is proposed; the monitoring system of core rock-fill damand rolling on dam surface.The monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia, Nuozhadu core rock-fill dam, as the core component of the construction process control architecture

Keywords: high core rock-fill dam     filling construction process     real-time monitoring     transportation to dam     rollingon dam surface     development and application    

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

Dai Huichao,Peng Peng

Strategic Study of CAE 2004, Volume 6, Issue 2,   Pages 33-37

Abstract:

The article introduced the selection and verification of the structural pattern of the penstock andThe selection of the structural pattern of the penstock and spiral case in the TGP power-station is not

Keywords: TGP     penstock     spiral case    

Phosphorus release potential and pollution characteristics of sediment in downstream Nansi Lake, China

Zhijian LI, Qinyan YUE, Baoyu GAO, Yanwen WANG, Qing LIU

Frontiers of Environmental Science & Engineering 2012, Volume 6, Issue 2,   Pages 162-170 doi: 10.1007/s11783-011-0313-7

Abstract: high sedimentary phosphorus load and release from sediment, when external phosphorus was reduced in downstreamTherefore, sedimentary phosphorus can be a secondary pollution source in downstream Nansi Lake.

Keywords: Nansi Lake     sediment     phosphorus     release potential     equilibrium phosphate concentration    

SH-Mode Seismic-Reflection Imaging of Earthfill Dams Article

Edward W. Woolery

Engineering 2018, Volume 4, Issue 5,   Pages 694-701 doi: 10.1016/j.eng.2018.08.009

Abstract: ., faults, cavities, low-velocity layers, etc.) are typical problems in near-surface geophysics.Dam-related issues are becoming more frequent in the United States, because a large part of this majorAddressing dam-related problems solely with traditional invasive drilling techniques is often inadequateHowever, strategic geotechnical drilling integrated with the broad utility of near-surface geophysics

Keywords: Geophysics     Seismic reflection     Shear-wave     Near-surface     Dam safety    

Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream

Lu Yongjun ,Chen Zhicong,Zhao lianbai ,Shao Xuejun,Yang Meiqing,Li Yunzhong

Strategic Study of CAE 2002, Volume 4, Issue 10,   Pages 67-72

Abstract:

The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data. The water level lowering and it's impact on navigation in the period of construction and initial stage operation of the Three Gorges project are predicted by use of the results of mathematical and physical model.

Keywords: Gezhouba project     Three Gorges project     erosion     water level lowering     navigation lock and navigation channel     mathematical model     physical model    

The analysis on reservoir sediment deposition and downstream river channel scouring after impoundment

Lu Jinyou,Huang Yue,Wang Jun

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 129-136

Abstract: after impoundment and operation of the Three Gorges Reservoir, the reservoir sediment deposition and downstreamIt is indicated through analysis that the reservoir sediment deposition and downstream river channel

Keywords: Three Gorges Project     trial impoundment     reservoir sediment deposition     downstream river channel scouring    

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1,   Pages 76-83 doi: 10.1007/s11709-012-0144-z

Abstract: The 130 m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part ofThe dam is founded on highly folded and partially crushed dolomite and limestone formations.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and threein the rock foundation of the right abutment outside of the dam.The paper describes the long-term safety monitoring of this 42 years old arch dam.

Keywords: dam safety concept     arch dam     dam instrumentation     dam safety monitoring    

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Strategic Study of CAE 2000, Volume 2, Issue 12,   Pages 84-89

Abstract: The scientific and technological achievements and their application in geologic exploration, dam construction, flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slopeThey in elude the 181 m-high concrete gravity dam in the Three Gorges Project, the 240 m — highCFRD, the 233 m~high Shuibuya CFRD, the 130 m- high Shapai RCC arch dam, the 131 m- high Jiangya RCCgravity dam, etc.

Keywords: hydroelectric power     high dam     gravity dam     arch dam     roller compacted concrete dam (RC-CD)     concrete facerockfill dam (CFRD)    

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 56-64 doi: 10.1007/s11709-010-0005-6

Abstract: Earthquakes can affect large dam projects in many different ways.Among these dams were the 132-m-high Shapai RCC arch dam and the 156-m-high Zipingpu concrete face rockfilldam.These recently completed dams are dam types which, up to now, have not experienced strong ground shakingThe widespread mass movements have caused substantial damage to dams and surface powerhouses in Sichuan

Keywords: seismic hazard     arch dam     concrete face rockfill dam     strong motion instrumentation     reservoir-triggered    

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 98-104 doi: 10.1007/s11709-010-0004-7

Abstract: The dam heightening, which is an effective way to increase reservoir volume, has been paid close attentionThree problems should be dealt with when an arch dam needs to be heightened: stress state getting worseat dam heel, cracking on new added concrete dam surface, and weak bonding between new added concreteand old dam.The tensile stresses on dam’s surface and joint face that have certain relations to the dam heightening

Keywords: arch dam     heighten     tensile stress     finite element method    

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 63-70 doi: 10.1007/s11709-010-0016-3

Abstract: determining the relevant material parameters for a valuation of the deformation behavior of the up- and downstreamdam shell by means of an embankment dam of medium height.This gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.Several times higher dam settlements as well as significant differential settlements between the up-and downstream dam shell were observed during construction and operation.

Keywords: embankment dam     bituminous concrete membrane     rock-fill material properties     deformation behavior    

Lagrangian simulation of deposition of CO gas-solid sudden expansion flow

HUANG Dongping, DING Guoliang, QUACK Hans

Frontiers in Energy 2008, Volume 2, Issue 2,   Pages 216-221 doi: 10.1007/s11708-008-0032-3

Abstract: Freezing and blockage resulting from the deposition of solid CO formed because of sudden expansion of the downstream

Keywords: comparison     gas-solid     downstream     blockage     Lagrangian    

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 92-101 doi: 10.1007/s11709-010-0009-2

Abstract: In this paper we analyzed a real fill-type dam, named the Minami-Aiki Dam, to verify a numerical consolidation

Keywords: fill dam     consolidation analysis     unsaturated geo-materials     impounding     construction    

Analysis of arch dam deformations

Franz PERNER, Pius OBERNHUBER,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 102-108 doi: 10.1007/s11709-010-0012-7

Abstract: Predicting “regular” dam deformations for prevailing conditions and comparing them with observeddeformations is an essential part of dam surveillance.Prediction of dam deformations can be based on deterministic models, purely statistical models or so-calledand the portion caused by temperature variation.The present article deals with the analysis of arch damprocedure is employed for the analysis of the deformations of the 186 m high Zillergruendl arch dam

Keywords: arch dam     analysis     Zillergruendl     concrete temperature     hybrid model    

Title Author Date Type Operation

Key Technologies of the Hydraulic Structures of the Three Gorges Project

Xinqiang Niu

Journal Article

application of the real-time monitoring system for filling construction process of high core rock-fill dam

Cui Bo,Hu Lianxing,Liu Donghai

Journal Article

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

Dai Huichao,Peng Peng

Journal Article

Phosphorus release potential and pollution characteristics of sediment in downstream Nansi Lake, China

Zhijian LI, Qinyan YUE, Baoyu GAO, Yanwen WANG, Qing LIU

Journal Article

SH-Mode Seismic-Reflection Imaging of Earthfill Dams

Edward W. Woolery

Journal Article

Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream

Lu Yongjun ,Chen Zhicong,Zhao lianbai ,Shao Xuejun,Yang Meiqing,Li Yunzhong

Journal Article

The analysis on reservoir sediment deposition and downstream river channel scouring after impoundment

Lu Jinyou,Huang Yue,Wang Jun

Journal Article

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Journal Article

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Journal Article

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Journal Article

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Journal Article

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Journal Article

Lagrangian simulation of deposition of CO gas-solid sudden expansion flow

HUANG Dongping, DING Guoliang, QUACK Hans

Journal Article

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Journal Article

Analysis of arch dam deformations

Franz PERNER, Pius OBERNHUBER,

Journal Article